{"id":4128,"date":"2026-06-16T12:38:58","date_gmt":"2026-06-16T12:38:58","guid":{"rendered":"https:\/\/streambim.com\/?p=4128"},"modified":"2026-06-16T12:59:31","modified_gmt":"2026-06-16T12:59:31","slug":"savings-between-construction-phases-with-total-bim","status":"publish","type":"post","link":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/","title":{"rendered":"Besparelser mellom byggetrinn med Total BIM"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4128\" class=\"elementor elementor-4128\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e38f2d6 e-con-full e-flex e-con e-parent\" data-id=\"e38f2d6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cf42063 elementor-widget elementor-widget-heading\" data-id=\"cf42063\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h4 class=\"elementor-heading-title elementor-size-default\">The savings lie in the transitions between construction phases - \nHow Total BIM creates value from design to operations<\/h4>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3984151 elementor-widget elementor-widget-text-editor\" data-id=\"3984151\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h5>In many construction projects, it is not a lack of information that causes problems. It is a lack of shared, up-to-date and usable information when decisions need to be made.<br \/>The latest revision is in one place. Clarifications are in another. O&amp;M data is often collected late. And when the project moves from design to production, from the construction site to handover, and from documentation to operation, time, quality and control are lost.<br \/><br \/>It is in these transitions that Total BIM creates value.<br \/><br \/>When the BIM model becomes the operational source of truth, information is moved out of static drawings, PDFs, emails and manual clarifications \u2013 and into a shared model-based workflow. Then BIM becomes more than just a design tool. It becomes a management foundation for the entire value chain.<\/h5>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9c30a62 elementor-widget elementor-widget-text-editor\" data-id=\"9c30a62\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4>The savings therefore lie not only in lower costs. They lie in fewer rounds of clarification, less waiting, fewer errors built into the design, less rectification at handover and a better data foundation for operations.<\/h4>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-53b4329 elementor-widget elementor-widget-heading\" data-id=\"53b4329\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">From design: make better decisions before errors become costly<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4841d7e elementor-widget elementor-widget-text-editor\" data-id=\"4841d7e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In the design phase, the value is about more than just creating a good model. It is about ensuring that the model actually becomes a shared basis for decision-making.<br \/><br \/>When disciplines work towards the same up-to-date information base, it becomes easier to see the consequences of changes, detect clashes, clarify interfaces and reduce the risk of errors being passed on to the construction site.<br \/><br \/>This is one of the key benefits of Total BIM: the information does not remain isolated with the designers. It is structured so that it can be used by those responsible for planning, building, inspecting, handing over and operating the project.<br \/><br \/>Chalmers\u2019 research on Total BIM highlights precisely this shift. The value lies not only in the 3D model, but in how the model changes working practices and creates a shared information base throughout the project.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a5ce92f elementor-widget elementor-widget-image\" data-id=\"a5ce92f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"462\" src=\"https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/Lifecycle-BIM-1024x591.png\" class=\"attachment-large size-large wp-image-4146\" alt=\"\" srcset=\"https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/Lifecycle-BIM-1024x591.png 1024w, https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/Lifecycle-BIM-300x173.png 300w, https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/Lifecycle-BIM-768x443.png 768w, https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/Lifecycle-BIM-1536x886.png 1536w, https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/Lifecycle-BIM-2048x1182.png 2048w, https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/Lifecycle-BIM-18x10.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">StreamBIM is a great fit for the Total BIM methodology, throughout the project lifecycle<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-534fd97 elementor-widget elementor-widget-heading\" data-id=\"534fd97\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">To build: when the information must work in the field<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-de8e5c0 elementor-widget elementor-widget-text-editor\" data-id=\"de8e5c0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>For contractors and project management, BIM only becomes truly valuable when the model works on the construction site.<br \/><br \/>It is of little use that the information exists if it is not easy to find, understand and use during construction. When the latest revision is difficult to identify, or clarifications are scattered across emails, meetings and PDFs, the risk of delays, misunderstandings and construction errors increases.<br \/><br \/>In practice, cost savings often boil down to very specific things: finding the right information faster, reducing the number of clarification rounds, avoiding work being carried out in the wrong order, detecting deviations earlier and giving more roles access to the same basis for decision-making.<br \/><br \/>Over time, Skanska and other contractors have highlighted BIM as a driver for better coordination, better sequencing and lower risk in complex projects. It is often here that the argument becomes most concrete for the site organisation: less waiting, fewer errors and better flow in production.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6cd72f4 elementor-widget elementor-widget-text-editor\" data-id=\"6cd72f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4>Total BIM is therefore not about introducing yet another digital layer on top of the project. It is about making the model a working basis that is actually used where the work takes place.<\/h4>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-244976a elementor-widget elementor-widget-heading\" data-id=\"244976a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">To handover: from final clean-up to ongoing delivery<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1d7e477 elementor-widget elementor-widget-text-editor\" data-id=\"1d7e477\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><b>Handover is one of the most underestimated loss points in construction projects.<\/b><\/p><p>A great deal of information already exists within the project, but it is often not structured in such a way that it can be used directly by the client or operations. The result is that documentation must be gathered, organised, checked and completed late in the process. This creates duplication of work. It creates uncertainty. And it undermines confidence in the data foundation just as the building is about to be taken into use.<\/p><p>With Total BIM, the handover is brought forward in the project. Information is linked to objects, rooms, systems and responsibilities as the project progresses. The handover then becomes not a separate tidying-up task at the end, but an ongoing part of the project\u2019s information flow.<\/p><p>buildingSMART and COBie highlight the same principle: the value of digital handover lies in structuring the information that is actually needed for operation, maintenance and management. Not just delivering more documentation, but delivering documentation that can be used.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7f21c48 elementor-widget elementor-widget-heading\" data-id=\"7f21c48\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">To FM: when documentation becomes a working basis<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8fcf4f9 elementor-widget elementor-widget-text-editor\" data-id=\"8fcf4f9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><b>For the operations team, the problem is rarely a lack of documentation. The problem is that the documentation is often not linked to the building\u2019s actual use.<\/b><\/p><p>Where is the equipment located? Which room does it concern? Which component is installed? What is the history? What maintenance is required? Who is responsible? When was it last updated? When this information is scattered or difficult to rely on, the client loses value even after the project is completed.<\/p><p>The greatest financial benefit of improved information flow is often realised over the building\u2019s lifetime. When operations and management receive structured, up-to-date and usable information, it becomes easier to plan maintenance, handle deviations, track deliveries and build on the data.<\/p><p>Handover is not the end of the BIM process. It is the start of a more data-driven operational phase.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e088263 elementor-widget elementor-widget-heading\" data-id=\"e088263\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Where the savings actually lie<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c58bbf2 elementor-widget elementor-widget-text-editor\" data-id=\"c58bbf2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The savings achieved with Total BIM do not stem from any single feature. They result from improved interaction between technology, information structure and work processes.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ae16a99 eael-table-align-center eael-dt-th-align-left elementor-widget elementor-widget-eael-data-table\" data-id=\"ae16a99\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"eael-data-table.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"eael-data-table-wrap\" data-table_id=\"ae16a99\" id=\"eael-data-table-wrapper-ae16a99\" data-custom_responsive=\"false\">\n\t\t\t<table class=\"tablesorter eael-data-table center\" id=\"eael-data-table-ae16a99\">\n\t\t\t    <thead>\n\t\t\t        <tr class=\"table-header\">\n\t\t\t\t\t\t\t\t\t            <th class=\"\" id=\"\" colspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"data-table-header-text\">Drivers for cost savings <\/span><\/th>\n\t\t\t        \t\t\t\t            <th class=\"\" id=\"\" colspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"data-table-header-text\">What it reduces <\/span><\/th>\n\t\t\t        \t\t\t\t            <th class=\"\" id=\"\" colspan=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"data-table-header-text\">Where value is created<\/span><\/th>\n\t\t\t        \t\t\t\t        <\/tr>\n\t\t\t    <\/thead>\n\t\t\t  \t<tbody>\n\t\t\t\t\t\t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tOne single source of truth\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tVersioning errors, duplication of effort and uncertainty \t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tDesign, build and handover\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr>\n\t\t\t        \t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tControl and traceability \t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tWrong decisions and unclear lines of responsibility \t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tDesign and build\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr>\n\t\t\t        \t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tSecure information flow \t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tIncorrect access, misuse and fragmented information sharing\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tThe entire value chain\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr>\n\t\t\t        \t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tField adoption \t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tDelays, misunderstandings and incorrect construction Build\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tBuild\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr>\n\t\t\t        \t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tStructured handover\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tFinal clean-up, omissions and weak O&amp;M deliverables\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tHandover and FM\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr>\n\t\t\t        \t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tData-driven operations\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tManual processes, weak decision-making basis and low data quality\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t   \t\t\t\t\t\t\t\t\t\t\t<td colspan=\"\" rowspan=\"\" class=\"\" id=\"\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"td-content-wrapper\"><div class=\"td-content\">\n\t\t\t\t\t\t\t\t\t\t\t\t\tFM and portfolio\t\t\t\t\t\t\t\t\t\t\t\t<\/div><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/tr>\n\t\t\t        \t\t\t    <\/tbody>\n\t\t\t<\/table>\n\t\t<\/div>\n\t  \t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-61158d1 elementor-widget elementor-widget-text-editor\" data-id=\"61158d1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>This is also why Total BIM should not be seen as merely a digitalisation project. It represents a shift in how projects are planned, built, handed over and operated.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6bf4766 elementor-widget elementor-widget-heading\" data-id=\"6bf4766\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">From model to working method<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-92b12df elementor-widget elementor-widget-text-editor\" data-id=\"92b12df\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>BIM does not create value simply because the model exists. Value is created when the model is used by people other than BIM specialists.<br \/><br \/>When clients, consultants, contractors, skilled workers and operations teams all work from the same up-to-date information base, the gap between planning and production is reduced. Between requirements and delivery. Between documentation and operations.<br \/><br \/>This is what Total BIM in StreamBIM has been developed to support: making the model accessible, usable and controlled throughout the entire work process \u2013 from design to operations.<br \/><br \/>For organisations seeking to reduce errors, waiting times, rework and loss of information, the question is therefore not simply whether they \u201cuse BIM\u201d.<br \/><br \/>The question is whether BIM has actually become part of the way they work.<br \/><br \/>It is only then that Total BIM moves from digital ambition to measurable impact.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-09aa3ab e-flex e-con-boxed e-con e-parent\" data-id=\"09aa3ab\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f0495a7 elementor-cta--skin-cover elementor-animated-content elementor-bg-transform elementor-bg-transform-zoom-in elementor-widget elementor-widget-call-to-action\" data-id=\"f0495a7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"call-to-action.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-cta\">\n\t\t\t\t\t<div class=\"elementor-cta__bg-wrapper\">\n\t\t\t\t<div class=\"elementor-cta__bg elementor-bg\" style=\"background-image: url(https:\/\/streambim.com\/wp-content\/uploads\/2026\/04\/Developers_Europe_dimmed.png);\" role=\"img\" aria-label=\"Utviklere_Europa_dempet\"><\/div>\n\t\t\t\t<div class=\"elementor-cta__bg-overlay\"><\/div>\n\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-cta__content\">\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<h4 class=\"elementor-cta__title elementor-cta__content-item elementor-content-item elementor-animated-item--grow\">\n\t\t\t\t\t\t\u00d8nsker du \u00e5 redusere datatap\/datatap mellom prosjektstadier og f\u00e5 et bedre grunnlag for l\u00e6ring og kvalitetssikring i prosjektene dine?\t\t\t\t\t<\/h4>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-cta__description elementor-cta__content-item elementor-content-item elementor-animated-item--grow\">\n\t\t\t\t\t\tSnakk med oss om hvordan StreamBIM brukes i praksis.\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-cta__button-wrapper elementor-cta__content-item elementor-content-item elementor-animated-item--grow\">\n\t\t\t\t\t<a class=\"elementor-cta__button elementor-button elementor-size-\" href=\"https:\/\/streambim.com\/nb-no\/contact-us\/\">\n\t\t\t\t\t\tTa kontakt med oss!\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>The savings lie in the transitions between construction phases &#8211; How Total BIM creates value from design to operations In many construction projects, it is not a lack of information that causes problems. It is a lack of shared, up-to-date and usable information when decisions need to be made.The latest revision is in one place. [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":4110,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[13],"tags":[],"class_list":["post-4128","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-knowledge"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"The StreamBIM Team\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"nb_NO\" \/>\n\t\t<meta property=\"og:site_name\" content=\"StreamBIM - BIM Collaboration, Made for Boots on the Ground\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Total BIM savings in transitions between construction phases\" \/>\n\t\t<meta property=\"og:description\" content=\"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-06-16T12:38:58+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-06-16T12:59:31+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/streambim\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@streambim\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Total BIM savings in transitions between construction phases\" \/>\n\t\t<meta name=\"twitter:description\" content=\"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@streambim\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#blogposting\",\"name\":\"Total BIM savings in transitions between construction phases\",\"headline\":\"Savings between construction phases with Total BIM\",\"author\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/author\\\/streambim-team\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/streambim.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/StreamBIM-1-e1781183238477.png\",\"width\":1499,\"height\":725},\"datePublished\":\"2026-06-16T12:38:58+00:00\",\"dateModified\":\"2026-06-16T12:59:31+00:00\",\"inLanguage\":\"nb-NO\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#webpage\"},\"articleSection\":\"Knowledge\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/streambim.com\\\/nb-no\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/category\\\/knowledge\\\/#listItem\",\"name\":\"Knowledge\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/category\\\/knowledge\\\/#listItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/category\\\/knowledge\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#listItem\",\"name\":\"Savings between construction phases with Total BIM\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#listItem\",\"position\":3,\"name\":\"Savings between construction phases with Total BIM\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/category\\\/knowledge\\\/#listItem\",\"name\":\"Knowledge\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/#organization\",\"name\":\"StreamBIM\",\"description\":\"BIM Collaboration, Made for Boots on the Ground\",\"url\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/\",\"email\":\"office@streambim.com\",\"telephone\":\"+4724076767\",\"foundingDate\":\"2012-06-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":10,\"maxValue\":50},\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/vmyiimbj.elementor.cloud\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/Streambim-site-icon.png\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/streambim\\\/\",\"https:\\\/\\\/www.twitter.com\\\/streambim\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCSsbQWnHzfv9eyIKExVFlBg\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/2622560\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/author\\\/streambim-team\\\/#author\",\"url\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/author\\\/streambim-team\\\/\",\"name\":\"The StreamBIM Team\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/53d7cece252daff80b8bb2246f58522a9a188a7fc1efb92088c77ae34177f957?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"The StreamBIM Team\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#webpage\",\"url\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/\",\"name\":\"Total BIM savings in transitions between construction phases\",\"description\":\"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.\",\"inLanguage\":\"nb-NO\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/author\\\/streambim-team\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/author\\\/streambim-team\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/streambim.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/StreamBIM-1-e1781183238477.png\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#mainImage\",\"width\":1499,\"height\":725},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/savings-between-construction-phases-with-total-bim\\\/#mainImage\"},\"datePublished\":\"2026-06-16T12:38:58+00:00\",\"dateModified\":\"2026-06-16T12:59:31+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/#website\",\"url\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/\",\"name\":\"StreamBIM\",\"alternateName\":\"Rendra BIM Collaboration\",\"description\":\"BIM Collaboration, Made for Boots on the Ground\",\"inLanguage\":\"nb-NO\",\"publisher\":{\"@id\":\"https:\\\/\\\/streambim.com\\\/nb-no\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Total BIM savings in transitions between construction phases","description":"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.","canonical_url":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#blogposting","name":"Total BIM savings in transitions between construction phases","headline":"Savings between construction phases with Total BIM","author":{"@id":"https:\/\/streambim.com\/nb-no\/author\/streambim-team\/#author"},"publisher":{"@id":"https:\/\/streambim.com\/nb-no\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/StreamBIM-1-e1781183238477.png","width":1499,"height":725},"datePublished":"2026-06-16T12:38:58+00:00","dateModified":"2026-06-16T12:59:31+00:00","inLanguage":"nb-NO","mainEntityOfPage":{"@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#webpage"},"isPartOf":{"@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#webpage"},"articleSection":"Knowledge"},{"@type":"BreadcrumbList","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/streambim.com\/nb-no#listItem","position":1,"name":"Home","item":"https:\/\/streambim.com\/nb-no","nextItem":{"@type":"ListItem","@id":"https:\/\/streambim.com\/nb-no\/category\/knowledge\/#listItem","name":"Knowledge"}},{"@type":"ListItem","@id":"https:\/\/streambim.com\/nb-no\/category\/knowledge\/#listItem","position":2,"name":"Knowledge","item":"https:\/\/streambim.com\/nb-no\/category\/knowledge\/","nextItem":{"@type":"ListItem","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#listItem","name":"Savings between construction phases with Total BIM"},"previousItem":{"@type":"ListItem","@id":"https:\/\/streambim.com\/nb-no#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#listItem","position":3,"name":"Savings between construction phases with Total BIM","previousItem":{"@type":"ListItem","@id":"https:\/\/streambim.com\/nb-no\/category\/knowledge\/#listItem","name":"Knowledge"}}]},{"@type":"Organization","@id":"https:\/\/streambim.com\/nb-no\/#organization","name":"StreamBIM","description":"BIM Collaboration, Made for Boots on the Ground","url":"https:\/\/streambim.com\/nb-no\/","email":"office@streambim.com","telephone":"+4724076767","foundingDate":"2012-06-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":10,"maxValue":50},"logo":{"@type":"ImageObject","url":"https:\/\/vmyiimbj.elementor.cloud\/wp-content\/uploads\/2025\/06\/Streambim-site-icon.png","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#organizationLogo"},"image":{"@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/streambim\/","https:\/\/www.twitter.com\/streambim\/","https:\/\/www.youtube.com\/channel\/UCSsbQWnHzfv9eyIKExVFlBg","https:\/\/www.linkedin.com\/company\/2622560\/"]},{"@type":"Person","@id":"https:\/\/streambim.com\/nb-no\/author\/streambim-team\/#author","url":"https:\/\/streambim.com\/nb-no\/author\/streambim-team\/","name":"The StreamBIM Team","image":{"@type":"ImageObject","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/53d7cece252daff80b8bb2246f58522a9a188a7fc1efb92088c77ae34177f957?s=96&d=mm&r=g","width":96,"height":96,"caption":"The StreamBIM Team"}},{"@type":"WebPage","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#webpage","url":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/","name":"Total BIM savings in transitions between construction phases","description":"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.","inLanguage":"nb-NO","isPartOf":{"@id":"https:\/\/streambim.com\/nb-no\/#website"},"breadcrumb":{"@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#breadcrumblist"},"author":{"@id":"https:\/\/streambim.com\/nb-no\/author\/streambim-team\/#author"},"creator":{"@id":"https:\/\/streambim.com\/nb-no\/author\/streambim-team\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/streambim.com\/wp-content\/uploads\/2026\/06\/StreamBIM-1-e1781183238477.png","@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#mainImage","width":1499,"height":725},"primaryImageOfPage":{"@id":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/#mainImage"},"datePublished":"2026-06-16T12:38:58+00:00","dateModified":"2026-06-16T12:59:31+00:00"},{"@type":"WebSite","@id":"https:\/\/streambim.com\/nb-no\/#website","url":"https:\/\/streambim.com\/nb-no\/","name":"StreamBIM","alternateName":"Rendra BIM Collaboration","description":"BIM Collaboration, Made for Boots on the Ground","inLanguage":"nb-NO","publisher":{"@id":"https:\/\/streambim.com\/nb-no\/#organization"}}]},"og:locale":"nb_NO","og:site_name":"StreamBIM - BIM Collaboration, Made for Boots on the Ground","og:type":"article","og:title":"Total BIM savings in transitions between construction phases","og:description":"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.","og:url":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/","article:published_time":"2026-06-16T12:38:58+00:00","article:modified_time":"2026-06-16T12:59:31+00:00","article:publisher":"https:\/\/www.facebook.com\/streambim\/","twitter:card":"summary_large_image","twitter:site":"@streambim","twitter:title":"Total BIM savings in transitions between construction phases","twitter:description":"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.","twitter:creator":"@streambim"},"aioseo_meta_data":{"post_id":"4128","title":"Total BIM savings in transitions between construction phases","description":"How the Nordic Total BIM methodology creates value - from design to operations. The savings lie in the transitions between construction phases.","keywords":null,"keyphrases":{"focus":{"keyphrase":"Total BIM","score":82,"analysis":{"keyphraseInTitle":{"score":9,"maxScore":9,"error":0},"keyphraseInDescription":{"score":9,"maxScore":9,"error":0},"keyphraseLength":{"score":9,"maxScore":9,"error":0,"length":2},"keyphraseInURL":{"score":5,"maxScore":5,"error":0},"keyphraseInIntroduction":{"score":9,"maxScore":9,"error":0},"keyphraseInSubHeadings":{"score":3,"maxScore":9,"error":1},"keyphraseInImageAlt":{"score":3,"maxScore":9,"error":1},"keywordDensity":{"type":"best","score":9,"maxScore":9,"error":0}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-06-16 01:41:00","updated":"2026-06-16 13:51:44","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/streambim.com\/nb-no\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/streambim.com\/nb-no\/category\/knowledge\/\" title=\"Knowledge\">Knowledge<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSavings between construction phases with Total BIM\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/streambim.com\/nb-no"},{"label":"Knowledge","link":"https:\/\/streambim.com\/nb-no\/category\/knowledge\/"},{"label":"Savings between construction phases with Total BIM","link":"https:\/\/streambim.com\/nb-no\/savings-between-construction-phases-with-total-bim\/"}],"_links":{"self":[{"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/posts\/4128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/comments?post=4128"}],"version-history":[{"count":25,"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/posts\/4128\/revisions"}],"predecessor-version":[{"id":4173,"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/posts\/4128\/revisions\/4173"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/media\/4110"}],"wp:attachment":[{"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/media?parent=4128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/categories?post=4128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/streambim.com\/nb-no\/wp-json\/wp\/v2\/tags?post=4128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}